Langley House
Paint house Exterior Hardie Board Siding, Shutters and Cedar Shakes. Activities undertaken by Pro Works Fraser Valley;
-
Pressure washing 5-7 days in advance to clean surfaces allowing dry time before painting and staining
-
Boom lift ordered one week before needed to ensure delivery
-
Hearing protection and safety goggles for pressure washing and sanding
-
Roof anchors and 5-point harnesses used during all roof and boom lift work to ensure painter safety
-
Ladder Jacks installed in roof to reach high cedar shake areas
-
Roof shingles re-sealed with roof tar sealant once roof equipment removed to ensure no water intrusion issues upon completion of job
- Drop sheets in all working areas to ensure no paint drops
-
Shakes sanded before staining to remove old stain. Wiped to remove all dust, before receiving two coats of Sherwin Williams WoodScapes Solid Hide Stain
-
Hardie Board was painted with brush and roller using Duration Satin finish from Sherwin Williams
-
Shutters were scraped, sanded, wiped, and primed with oil-based primer before receiving two coats of Sherwin Williams Emerald Rain Refresh Satin Paint
-
Applied out of direct sunlight whenever possible for optimal adhesion and curing time.
Step stools, 8-13 Multiway Ladders, 24-foot extension ladders, 32-foot extension ladders, and a 45-foot articulating boom-lift used to access all high areas. Ladder wings used for accessing roof to prevent damage to eavestroughs.